Blogging our latest news.

Front Yard Stormwater System

Way back in June we installed the first of two large underground stormwater retention systems, underneath the driveway. We had to hold off installing the second system in the front yard until the construction trailer was removed and we were [...]

Read more

Kitchen Countertops

Recently I accompanied our designer down to the stone fabricator to sign off on the final layouts for our kitchen countertops. Our fabricator, New View Marble and Granite in Franklin, MA, had been up earlier in the week to prepare [...]

Read more

Documenting our work

As part of the goal to “future-proof” this home, we’re working with a local construction documentation firm, Multivista, to prepare a full set of in-wall, exterior, and site photos for future reference.  After mechanical rough-in but before the walls [...]

Read more

Certifications

As work continues, this seems like an opportune time to discuss some of the certifications we are seeking for this home and describe what they encompass. Certifications are voluntary – our only requirement is to meet the building codes in effect [...]

Read more

Kitchen

We reached another big milestone this week with the delivery of our kitchen cabinetry. Our cabinet manufacturer, Herrick & White in Cumberland, RI, brought up the cabinets Wednesday and immediately got started with installation. H&W was able to [...]

Read more

Interior Finish Starts!

Now that drywall, plaster, and priming are complete, the crew is busy installing cabinets, tile, trim, and doors. There’s something going on in every part of the house! Our cabinet manufacturer, Herrick & White, delivered the upper mudroom and [...]

Read more

Landscaping

As the inside of the project moves along, outside it is a race to finish up our landscaping before winter.  Our landscape architect, Sudbury Design Group, and the landscape contractor, Moniz Landscaping, have designed and executed a beautiful plan for [...]

Read more

Duct sealing

Our HVAC installer, Boucher Energy Systems, was out Friday to commence duct sealing.  The Energy Star rating system specifies a maximum permissible amount of duct leakage from our ventilation ducts.  Even though the entire duct system is located within the [...]

Read more

Getting Plastered…

As soon as the insulation contractor finished with the interior acoustic insulation (actually, even before), our drywall and plaster contractors were on the site to keep things moving.  Being ever mindful of our goal of a low-VOC house, our contractor [...]

Read more

Our Own Solar System

We hit a big milestone today - we went off the grid and starting producing our own electric power!  Our 14.7 kW array will provide a substantial amount of the home’s energy during most of the year.  Our solar installer, [...]

Read more